+971 2 599 4200

Glass Processing

glass

Our quality
We provide high performance Green Building Facades for sustainability and environmental compliance. The relentless increase of CO2 emissions, particularly in the Gulf region is signaling and alarm for architects to emphasize on climate-responsive buildings.(High performance green Buildings, HPGB). It generates the need to incorporate facades and the right selection of glazing to produce low-energy architecture. We employ the world renowned LEED® system where projects earn LEED® points for satisfying specific Green building criteria.

Process Flow
The glass process flow consists of elaborate and intricate systems in glass processing which include cutting, refining edges and polishing glass. Glass is also insulates, laminates and tempered according to the client’s requirements. We employ the best machinery and the most experienced personnel to undertake the responsibility of providing optimum results and efficiency. We ensure Quality Control, at every stage. Process operators are responsible to check and comply with the specified inspection criteria and verified by the QC Engineer.

Our reputed products include

           •    REG Heat Treated Glass
           •    REG Fully tempered Glass (FT)
           •    REG Heat Strengthened Glass (HS)
           •    REG Insulated Glass Units
           •    REG Laminated Glass

 

2018 ACHIEVEMENTS

As another year comes to an end, we would like to take this opportunity to wish you all a Rewarding, Joyous New Year upon you and your loved ones. Since 2018 have been successful year for REA, it’s worth to highlight some of 2018 accomplishments;

Projects Handover

  • City of Lights
  • Nad Al Sheba
  • Axis Tower
  • W – Hotel

Projects Awarded

  • The Masdar Institute Neighbourhood
  • IL Primo - Luxury High-End Residential Tower 
  • The Address Residences
  • New SABIC headquarters building

Projects Progress

  • 98.0% on Vida Residences.
  • 95.0% on Suit In The Skai Tower.
  • 90.0% on Ashjar, Al Barari, Dubai.
  • 85.0% on Tiara United Tower
  • 80.0% on Seventh Heaven, Al Barari, Dubai.
  • 70.0% on Suit In The Skai Tower 1.
  • 60.0% on The Palm Tower, The Palm, Dubai
  • 43.0% on Masdar Neighborhood Institute, Masdar City, Abu Dhabi.
  • 15.0% on A2/A3 The Address Residences, Downtown, Dubai.
  • 8.0% on A4 Il Primo, Downtown, Dubai. 

CSR Activities

  • Share Initiative
  • 100 TYE - Cycle 3 

Publications

  • Trojan Holding Managing Director is being featured on the front page in the 100th Edition of Emirates Projects Magazine UAE
  • The managing director of construction group Trojan Holding, Eng Hamad Al Ameri, returns to Construction Week’s Power 100 list
  • Eng. Hamad Al Ameri, Managing Director of Trojan Holding outlines the path of long term success in Big Project Middle East
  • Trojan Holding MD says 5 year expat retirement plan will have a ‘huge positive impact’ on UAE
  • Trojan Holding extends successful education initiative 100 TYE

Events

  • Labours Day celebration by REA Management
  • Heat Stress Awareness Program by REA
  • NAPCO appreciation award to Reem Emirates Aluminum
  • UAE Flag Day Celebration 
  • Reem Emirates Aluminum organized awareness lecture and conducted medical examination on World Diabetes Day
  • UAE’s Commemoration Day
  • 47th UAE National Day Celebration
    ______________
  • We thrived because of your incredible hard work, creativity, and dedication. I am personally grateful to each one of you for your tremendous efforts. Through your commitments and efforts, REA has been capable of sustaining its position in the market as a leading Façade Company in UAE, with high and robust potentials in global markets. We will continue to provide high-quality façade solutions achieving clients’ retention and satiation.

    Every day, your support makes REA’s growth possible and I look forward to a successful, positive and productive year.
    Thank you for your efforts in 2018 and welcome 2019 with its challenges.

    CONTACT
    Scroll to top